Muaaz Construction Company

Company Dossier
2026

01 · About MCC

A standalone construction firm.

Muaaz Construction Company works on commercial, institutional and residential construction. The business has been active in the field since 2020. Muaaz Construction Company (SMC-Pvt) Ltd incorporated in November 2025; the company registration and PEC constructor record are presented separately in the credentials section.

An early institutional project was the structural retrofitting of 10 government schools across Khyber Pakhtunkhwa for IMC Worldwide, under the UK Department for International Development's School Construction and Rehabilitation Programme. This experience sits alongside the commercial and recreational projects in our portfolio.

What we build, stands.

02 · Leadership

A letter from the CEO.

Dr. Muhammad Hassan Khan

MCC was built on one principle: construction is execution, and execution is signed. Every structure we break ground on carries my personal sign-off — and that sign-off is a commitment, not a formality.

We have been active since 2020, starting with the structural retrofitting of ten government schools across Khyber Pakhtunkhwa for IMC Worldwide under the DFID-funded rehabilitation programme. That work gave us experience of formal project quality requirements — experience we bring to projects including City Centre Swabi and the White Palace Events Venue now in build.

I set one non-negotiable standard for every site: I ensure it is built to outlast me. Our reputation is not found in brochures — it is found in the skyline.

I don't just sign off on projects; I ensure they are built to outlast me.

— Dr. Muhammad Hassan Khan
CEO & Founder, Muaaz Construction Company

03 · Team

Direction and management.

Dr. Muhammad Hassan Khan
CEO & Founder, Muaaz Construction Company

Founder and CEO of Muaaz Construction Company. Sets the company's standard: every structure built to outlast its builders. Personally signs off on every project.

"I don't just sign off on projects; I ensure they are built to outlast me."

Engr. Muhammad Muaaz Khan
Director, Construction Management
MSc Construction Management · University of Birmingham

Brings postgraduate expertise in construction project delivery, procurement strategy, and contract management from the University of Birmingham. Oversees construction planning and programme management across MCC's portfolio.

"Sound management is the invisible structure behind every standing building."

Engr. Muhammad Khuzaifa Khan
Construction Manager
MSc Construction Management · University of Birmingham

Applies advanced construction management principles — cost control, risk assessment, and site coordination — developed through postgraduate study at the University of Birmingham. Ensures projects are delivered to MCC's exacting standards.

"Every detail on site reflects the discipline behind it."

Engr. Inayatullah
Projects Manager & Commercial Lead
MSc Structural Engineering · BSc Civil Engineering · UET Peshawar

Experience in project management, site supervision and commercial operations, including construction planning and coordination at City Centre Swabi. His background also includes school assessment and structural rehabilitation work under IMC Worldwide's DFID-funded programme in Khyber Pakhtunkhwa and Punjab.

04 · Services

What we build.

Commercial plazas

Retail-anchored mixed-use developments delivered as turnkey — groundworks through handover. Reference: City Centre Swabi.

Events venues

Long-span, column-free interiors with integrated landscape works. Current build: White Palace, 1,000-guest venue on 40 kanals.

Institutional retrofitting

Seismic assessment and structural rehabilitation for educational and public buildings. Reference: IMC Worldwide / DFID school programme.

Residential structures

Single and multi-unit residential construction, with work planned around the approved drawings, project specifications and agreed inspection requirements.

05 · Portfolio

Complete portfolio.

City Centre Swabi
Swabi, Khyber Pakhtunkhwa · Completed 2025 · Commercial · Retail plaza

A self-developed retail plaza in Swabi with 80 shops across two floors. Completed in 2025 and operated by MCC.

2
Floors
80
Retail units
~100,000 sq ft
Covered area
2025
Completed
City Centre Swabi, the retail frontage viewed from the road.
Site photograph · City Centre Swabi, the retail frontage viewed from the road.
The central entrance, shopfronts and upper-level walkway.
Site photograph · The central entrance, shopfronts and upper-level walkway.
An aerial view of the proposed retail layout and parking.
Architectural visualisation · An aerial view of the proposed retail layout and parking.
Retail layout showing shop units and circulation. For project illustration.
Illustrative plan · Retail layout showing shop units and circulation. For project illustration.
City Centre Swabi, entrance and retail frontage at dusk.
Architectural visualisation · City Centre Swabi, entrance and retail frontage at dusk.
An additional floor layout showing shop units and access. For project illustration.
Illustrative plan · An additional floor layout showing shop units and access. For project illustration.
Explore the full project
White Palace Events Venue
Swabi, Khyber Pakhtunkhwa · In build · Events venue · Long-span

An events venue in development on a 40-kanal site in Swabi, planned for 1,000 guests with a column-free main hall. The current target is completion in 2026.

1,000
Guest capacity
40 kanals
Grounds
Column-free
Interior
2026 (est.)
Opening
The main entrance and approach through the parking court.
Architectural visualisation · The main entrance and approach through the parking court.
Arrival court and the proposed entrance canopy.
Architectural visualisation · Arrival court and the proposed entrance canopy.
Side elevation, entrance and planting around the building.
Architectural visualisation · Side elevation, entrance and planting around the building.
Rear and side elevations with the proposed landscaped grounds.
Architectural visualisation · Rear and side elevations with the proposed landscaped grounds.
Explore the full project
Fazaia Driving Range & Fitness Club
Fazaia Housing Scheme, Tarnol, Islamabad · Completed 2025 · Recreational · Sports facility

A reinforced-concrete frame structure built for the Fazaia Golf Club at Fazaia Housing Scheme, Tarnol. Driving range on the ground floor, fitness club above, with a semi-basement and a mumty crowning the roof.

Semi-basement + 2 + Mumty
Levels
RC frame
Structure
Fazaia Housing Scheme
Client
2025
Completed
Fazaia Driving Range & Fitness Club, exterior view from the access road.
Site photograph · Fazaia Driving Range & Fitness Club, exterior view from the access road.
Explore the full project
IMC Worldwide School Retrofitting
Khyber Pakhtunkhwa, Pakistan · Completed 2020 · Institutional · Seismic retrofit

Structural assessment and retrofitting of 10 government schools across KP, under IMC Worldwide's DFID-funded School Construction and Rehabilitation Programme. MCC's first major third-party contract.

10
Schools
~50,000 sq ft
Covered area
IMC Worldwide (DFID)
Client
2020
Completed
Site team fitting mesh around an existing building corner.
Site photograph · Site team fitting mesh around an existing building corner.
Surface preparation at the mesh-covered corner.
Site photograph · Surface preparation at the mesh-covered corner.
A closer view of the mesh and its fixings at the corner.
Site photograph · A closer view of the mesh and its fixings at the corner.
A worker preparing material beside the intervention area.
Site photograph · A worker preparing material beside the intervention area.
Application work at the building corner.
Site photograph · Application work at the building corner.
Explore the full project

06 · Credentials

Registration and verification.

SECP
Securities & Exchange Commission of Pakistan

Incorporation as Single-Member Company, 03 November 2025. CUIN 0314095.

Visit SECP →
PEC
Pakistan Engineering Council

Constructor licence C3/E, number #10218. Valid until 30 June 2027. C3 project capacity Rs. 500 Million. Verify the registered holder and endorsed scope before appointment.

Visit PEC →
FBR
Federal Board of Revenue

NTN I003337. Check current taxpayer status with FBR when required.

Visit FBR →

Current documents are available for due diligence. Request credential copies and confirm that the registered party matches the proposed contract.

07 · Process

How a job moves through MCC.

  1. 01
    Brief

    Intake of the site, scope, and client-supplied structural drawings.

  2. 02
    Structural review

    MCC verifies the structural package matches site conditions. Any gaps are flagged in writing before mobilisation.

  3. 03
    Contract & permits

    Contract signed, PEC licence referenced, permits and approvals secured.

  4. 04
    Execution

    Construction to drawing. Material testing, batch records, progress photos archived throughout.

  5. 05
    Handover & agreed obligations

    Final inspection, project records and O&M handover, with defects obligations set by the contract.